Skip to content
  1. 1 · Places
  2. 2 · Dates
  3. 3 · Journeys
  4. 4 · Your plan

Journey plan

Your journey

Augsburg to Puttgarden on 11 November 2026

12h 40m to 16h 15m3 legs, changing in Munich and Berlin.Fare information: Indicative

Journey legs

  1. Augsburg to Munich

    Coach with Arverio Bayern GmbH, Flixbus

    45m to 1h 20m
    Getting there and waiting
    15m to 25m
    ModeCoach
    Baggage1 checked bag, up to 20 kg, includedOperator rules, read 11 Sept
    FareIndicative
    Source: GTFS.DE combined national GTFS dataset for Germany. Verified 19 October 2026. Observed figure.
    Booked on the operator’s own siteThis does not look right
    Munich changeTight

    Tight change coach to coach at the terminal: the leg before can run 35 min long and 35 min are counted for the change, which covers only part of the spread.

  2. Munich to Berlin

    Coach with FlixBus

    6h to 7h
    Getting there and waiting
    35m to 1h 25m
    ModeCoach
    Baggage1 checked bag, up to 20 kg, includedOperator rules, read 11 Sept
    FareIndicative
    Source: Pro Travel Net curated network, version 1. Verified 9 September 2026. Curated figure.
    Booked on the operator’s own siteThis does not look right
    Berlin changeTight

    Tight change coach to coach at the terminal: the leg before can run 60 min long and 35 min are counted for the change, which covers only part of the spread.

  3. Berlin to Puttgarden

    Coach with Flixbus

    4h 30m to 4h 40m
    Getting there and waiting
    35m to 1h 25m
    ModeCoach
    Baggage1 checked bag, up to 20 kg, includedOperator rules, read 11 Sept
    FareIndicative
    Source: GTFS.DE combined national GTFS dataset for Germany. Verified 19 October 2026. Observed figure.
    Booked on the operator’s own siteThis does not look right

Coach leg (FlixBus): one checked bag up to 20 kg included, one cabin bag up to 7 kg, see operator

Use this plan

https://protravelnet.com/en/journey/plan?from=Augsburg&to=Puttgarden&option=3&vd=2026-10-19&v=net-228abc86fbe813c9&s=38ecda167a340271

Known limits

Show known limits

Future schedules can change before 11 November 2026.

Travel intervals include uncertainty but cannot guarantee connections.

Operator baggage rules depend on the fare and ticket conditions.

Visa, document and customs requirements can change.

Train services by all operators between Augsburg and Puttgarden are suspended; other operators are not affected.

Times are typical ranges from published timetables and distance, not live departures. Nothing is booked here.

Contains data from: Timetable data from the DELFI dataset, processed and distributed by GTFS.DE, under CC BY 4.0

Engine
1.0.0
Network
net-228abc86fbe813c9
Network written
19 October 2026
Answer for
11 November 2026

The first leg is booked on the operator’s own site