Eindhoven to Venlo
Train with NS, Arriva
- Getting there and waiting
- 10m to 20m
Journey plan
Eindhoven to Lahore on 11 November 2026
Train with NS, Arriva
Safe change train to train at the station: the leg before can run 5 min long and 30 min are counted for the change.
Train with eurobahn, DB Fernverkehr AG, DB Fernverkehr (Codesharing), DB Regio AG NRW, MittelrheinBahn (Trans Regio), National Express, ÖBB
Safe change between two terminals in the city: the leg before can run 82 min long and 105 min are counted for the change.
Flight with scheduled airlines
Into the city from Lahore: taxi; the fare is unknown. Airport page, read 20 Sept
Train leg (NS): carry-on only, no checked luggage, see operator
Sending luggage ahead? Compare parcel prices at ShipPortal
https://protravelnet.com/en/journey/plan?from=Eindhoven&to=Lahore&mode=earliest&vd=2026-10-19&v=net-228abc86fbe813c9&s=dcdddfe17e918fad
Future schedules can change before 11 November 2026.
Travel intervals include uncertainty but cannot guarantee connections.
Operator baggage rules depend on the fare and ticket conditions.
Visa, document and customs requirements can change.
There is no direct train from Eindhoven to Lahore.
There is no direct coach from Eindhoven to Lahore.
Times are typical ranges from published timetables and distance, not live departures. Nothing is booked here.
Contains data from: Timetable data from the DELFI dataset, processed and distributed by GTFS.DE, under CC BY 4.0