Eindhoven to Amsterdam
Train with Arriva, NS, NS International, European Sleeper, GoVolta
- Getting there and waiting
- 10m to 20m
Journey plan
Eindhoven to Puttgarden on 11 November 2026
Train with Arriva, NS, NS International, European Sleeper, GoVolta
Safe change between two terminals in the city: the leg before can run 53 min long and 110 min are counted for the change.
Flight with scheduled airlines
Safe change between two terminals in the city: the leg before can run 12 min long and 75 min are counted for the change.
Coach with Flixbus
Train leg (NS): carry-on only, no checked luggage, see operator
Coach leg (FlixBus): one checked bag up to 20 kg included, one cabin bag up to 7 kg, see operator
Sending luggage ahead? Compare parcel prices at ShipPortal
https://protravelnet.com/en/journey/plan?from=Eindhoven&to=Puttgarden&vd=2026-10-19&v=net-228abc86fbe813c9&s=64e16e7a9a0412b6
Future schedules can change before 11 November 2026.
Travel intervals include uncertainty but cannot guarantee connections.
Operator baggage rules depend on the fare and ticket conditions.
Visa, document and customs requirements can change.
Train services by all operators between Eindhoven and Puttgarden are suspended; other operators are not affected.
Times are typical ranges from published timetables and distance, not live departures. Nothing is booked here.
Contains data from: Timetable data from the DELFI dataset, processed and distributed by GTFS.DE, under CC BY 4.0