Gujranwala to Lahore
Coach with Daewoo Express
- Getting there and waiting
- 25m to 45m
Journey plan
Gujranwala to Göppingen on 12 November 2026
Coach with Daewoo Express
Safe change between two terminals in the city: the leg before can run 30 min long and 125 min are counted for the change.
Flight with scheduled airlines
Tight change between two terminals in the city: the leg before can run 95 min long and 60 min are counted for the change, which covers only part of the spread.
Train with DB Fernverkehr AG, DB Fernverkehr (Codesharing), Flixtrain
Risky change train to train at the station: the leg before can run 68 min long and 30 min are counted for the change, which cannot absorb the spread.
Train with Arverio Baden-Württemberg GmbH, DB Regio AG Baden-Württemberg, DB Regio AG S-Bahn Stuttgart, Go-Ahead
Coach leg (Daewoo Express): checked luggage up to 30 kg included, see operator
https://protravelnet.com/en/journey/plan?from=Gujranwala&to=G%C3%B6ppingen&vd=2026-10-19&v=net-228abc86fbe813c9&s=efa6182dbee23afd
Future schedules can change before 12 November 2026.
Travel intervals include uncertainty but cannot guarantee connections.
Operator baggage rules depend on the fare and ticket conditions.
Visa, document and customs requirements can change.
There is no direct train from Gujranwala to Göppingen.
There is no direct coach from Gujranwala to Göppingen.
Times are typical ranges from published timetables and distance, not live departures. Nothing is booked here.
Contains data from: Timetable data from the DELFI dataset, processed and distributed by GTFS.DE, under CC BY 4.0