Karachi to Multan
Train with Pakistan Railways
- Getting there and waiting
- 20m to 40m
Journey plan
Karachi to Lahore on 31 October 2026
Train with Pakistan Railways
Risky change between two terminals in the city: the leg before can run 120 min long and 35 min are counted for the change, which cannot absorb the spread.
Coach with Daewoo Express, Faisal Movers
Train leg (Pakistan Railways): checked luggage up to 20 kg included, see operator
Coach leg (Daewoo Express): checked luggage up to 30 kg included, see operator
https://protravelnet.com/en/journey/plan?from=Karachi&to=Lahore&option=2&vd=2026-10-19&v=net-228abc86fbe813c9&s=76e857917a58236f
Future schedules can change before 31 October 2026.
Travel intervals include uncertainty but cannot guarantee connections.
Operator baggage rules depend on the fare and ticket conditions.
Visa, document and customs requirements can change.
Times are typical ranges from published timetables and distance, not live departures. Nothing is booked here.
The first leg is booked on the operator’s own site