Lyon to Paris
Train with SNCF TGV, Ouigo
- Getting there and waiting
- 15m to 30m
Journey plan
Lyon to Puttgarden on 1 November 2026
Train with SNCF TGV, Ouigo
Safe change train to train at the station: the leg before can run 10 min long and 30 min are counted for the change.
Train with Eurostar, Deutsche Bahn ICE
Safe change train to train at the station: the leg before can run 20 min long and 30 min are counted for the change.
Train with National Express, DB Fernverkehr (Codesharing), DB Fernverkehr AG, DB Regio AG NRW, EUROSTAR, Flixtrain, VIAS Rail GmbH, eurobahn, ÖBB
Risky change between two terminals in the city: the leg before can run 139 min long and 35 min are counted for the change, which cannot absorb the spread.
Coach with Flixbus
Train leg (SNCF TGV): carry-on only, 3 cabin bags, see operator
Train leg (Eurostar): checked luggage up to 30 kg at a fee, 3 cabin bags, see operator
Coach leg (FlixBus): one checked bag up to 20 kg included, one cabin bag up to 7 kg, see operator
Sending luggage ahead? Compare parcel prices at ShipPortal
https://protravelnet.com/en/journey/plan?from=Lyon&to=Puttgarden&option=1&vd=2026-10-19&v=net-228abc86fbe813c9&s=37150545ffe53e9a
Future schedules can change before 1 November 2026.
Travel intervals include uncertainty but cannot guarantee connections.
Operator baggage rules depend on the fare and ticket conditions.
Visa, document and customs requirements can change.
Train services by all operators between Lyon and Puttgarden are suspended; other operators are not affected.
Times are typical ranges from published timetables and distance, not live departures. Nothing is booked here.
Contains data from: Timetable data from the DELFI dataset, processed and distributed by GTFS.DE, under CC BY 4.0
The first leg is booked on the operator’s own site