Puttgarden to Hamburg
Coach with Flixbus
- Getting there and waiting
- 15m to 25m
Journey plan
Puttgarden to Rotterdam on 1 November 2026
Coach with Flixbus
Risky change between two terminals in the city: the leg before can run 50 min long and 30 min are counted for the change, which cannot absorb the spread.
Train with Deutsche Bahn
Tight change train to train at the station: the leg before can run 30 min long and 30 min are counted for the change, which covers only part of the spread.
Train with NS
Into the city from Rotterdam: a train, local buses; the fare is unknown. Airport page, read 19 Sept
Train leg (Deutsche Bahn): carry-on only, 2 cabin bags, see operator
Train leg (NS): carry-on only, no checked luggage, see operator
Coach leg (FlixBus): one checked bag up to 20 kg included, one cabin bag up to 7 kg, see operator
Sending luggage ahead? Compare parcel prices at ShipPortal
https://protravelnet.com/en/journey/plan?from=Puttgarden&to=Rotterdam&option=2&vd=2026-10-19&v=net-228abc86fbe813c9&s=13b00d115892e7e7
Future schedules can change before 1 November 2026.
Travel intervals include uncertainty but cannot guarantee connections.
Operator baggage rules depend on the fare and ticket conditions.
Visa, document and customs requirements can change.
Train services by all operators between Puttgarden and Rotterdam are suspended; other operators are not affected.
Times are typical ranges from published timetables and distance, not live departures. Nothing is booked here.
Contains data from: Timetable data from the DELFI dataset, processed and distributed by GTFS.DE, under CC BY 4.0
The first leg is booked on the operator’s own site