Skip to content
  1. 1 · Places
  2. 2 · Dates
  3. 3 · Journeys
  4. 4 · Your plan

Journey plan

Your journey

Puttgarden to Oslo on 1 November 2026

23h 49m to 27h 19m3 legs, changing in Lübeck and Kiel.Fare information: Indicative

Journey legs

  1. Puttgarden to Lübeck

    Coach with Flixbus

    1h 5m to 1h 20m
    Getting there and waiting
    15m to 25m
    ModeCoach
    Baggage1 checked bag, up to 20 kg, includedOperator rules, read 11 Sept
    FareIndicative
    Source: GTFS.DE combined national GTFS dataset for Germany. Verified 19 October 2026. Observed figure.
    Booked on the operator’s own siteThis does not look right
    Lübeck changeTight

    Tight change between two terminals in the city: the leg before can run 15 min long and 30 min are counted for the change, which covers only part of the spread.

  2. Lübeck to Kiel

    Train with DB Regio AG Nord, erixx

    44m to 54m
    Getting there and waiting
    30m to 1h 20m
    ModeTrain
    BaggageNo operator rule to read
    FareIndicative
    Source: GTFS.DE combined national GTFS dataset for Germany. Verified 19 October 2026. Observed figure.
    Booked on the operator’s own siteThis does not look right
    Kiel changeSafe

    Safe change through the port: the leg before can run 10 min long and 60 min are counted for the change.

  3. Kiel to Oslo

    Ferry with Color Line

    20h to 21h
    Getting there and waiting
    1h to 1h 50m
    Getting away at the other end
    15m to 30m
    ModeFerry
    BaggageNot stated on the operator page we readOperator rules, read 11 Sept
    FareIndicative
    Source: Pro Travel Net curated network, version 1. Verified 9 September 2026. Curated figure.
    Booked on the operator’s own siteThis does not look right

Coach leg (FlixBus): one checked bag up to 20 kg included, one cabin bag up to 7 kg, see operator

Use this plan

https://protravelnet.com/en/journey/plan?from=Puttgarden&to=Oslo&option=4&vd=2026-10-19&v=net-228abc86fbe813c9&s=c516e0d63d893aaf

Known limits

Show known limits

Future schedules can change before 1 November 2026.

Travel intervals include uncertainty but cannot guarantee connections.

Operator baggage rules depend on the fare and ticket conditions.

Visa, document and customs requirements can change.

Train services by all operators between Puttgarden and Oslo are suspended; other operators are not affected.

Times are typical ranges from published timetables and distance, not live departures. Nothing is booked here.

Contains data from: Timetable data from the DELFI dataset, processed and distributed by GTFS.DE, under CC BY 4.0

Engine
1.0.0
Network
net-228abc86fbe813c9
Network written
19 October 2026
Answer for
1 November 2026

The first leg is booked on the operator’s own site