Rotterdam to Amsterdam
Train with NS
- Getting there and waiting
- 15m to 30m
Journey plan
Rotterdam to Puttgarden on 1 November 2026
Train with NS
Safe change train to train at the station: the leg before can run 20 min long and 30 min are counted for the change.
Train with Deutsche Bahn
Tight change between two terminals in the city: the leg before can run 30 min long and 35 min are counted for the change, which covers only part of the spread.
Coach with Flixbus
Train leg (NS): carry-on only, no checked luggage, see operator
Train leg (Deutsche Bahn): carry-on only, 2 cabin bags, see operator
Coach leg (FlixBus): one checked bag up to 20 kg included, one cabin bag up to 7 kg, see operator
Sending luggage ahead? Compare parcel prices at ShipPortal
https://protravelnet.com/en/journey/plan?from=Rotterdam&to=Puttgarden&option=2&vd=2026-10-19&v=net-228abc86fbe813c9&s=241f6c4c8498a6e9
Future schedules can change before 1 November 2026.
Travel intervals include uncertainty but cannot guarantee connections.
Operator baggage rules depend on the fare and ticket conditions.
Visa, document and customs requirements can change.
Train services by all operators between Rotterdam and Puttgarden are suspended; other operators are not affected.
Times are typical ranges from published timetables and distance, not live departures. Nothing is booked here.
Contains data from: Timetable data from the DELFI dataset, processed and distributed by GTFS.DE, under CC BY 4.0
The first leg is booked on the operator’s own site