Sollentuna to Gothenburg
Train with SJ, Storstockholms Lokaltrafik, Mälartåg, Snälltåget, VR Snabbtåg, Västtrafik
- Getting there and waiting
- 10m to 20m
Journey plan
Sollentuna to Puttgarden on 11 November 2026
Train with SJ, Storstockholms Lokaltrafik, Mälartåg, Snälltåget, VR Snabbtåg, Västtrafik
Tight change through the port: the leg before can run 101 min long and 60 min are counted for the change, which covers only part of the spread.
Ferry with Stena Line
Risky change through the port: the leg before can run 60 min long and 35 min are counted for the change, which cannot absorb the spread.
Coach with Flixbus
Safe change coach to coach at the terminal: the leg before can run 5 min long and 35 min are counted for the change.
Coach with Flixbus
Coach leg (FlixBus): one checked bag up to 20 kg included, one cabin bag up to 7 kg, see operator
https://protravelnet.com/en/journey/plan?from=Sollentuna&to=Puttgarden&option=4&vd=2026-10-19&v=net-228abc86fbe813c9&s=6a197473a04e0694
Future schedules can change before 11 November 2026.
Travel intervals include uncertainty but cannot guarantee connections.
Operator baggage rules depend on the fare and ticket conditions.
Visa, document and customs requirements can change.
Train services by all operators between Sollentuna and Puttgarden are suspended; other operators are not affected.
Times are typical ranges from published timetables and distance, not live departures. Nothing is booked here.
Contains data from: Timetable data from the DELFI dataset, processed and distributed by GTFS.DE, under CC BY 4.0
The first leg is booked on the operator’s own site